User contributions for Danno
28 November 2021
- 20:1020:10, 28 November 2021 diff hist −14 Kestrel No edit summary current
- 20:0820:08, 28 November 2021 diff hist +2,243 N Kestrel Created page with "{{RocketInfoBox |image = Kestrel-ldrs38-edit.jpg |diameter = 2.24 inches (57mm) |length = 4 feet 1 inch (1.2 m) |weight = 2 lbs. 13.5 oz. (1.3 kg) |motor-size = 54mm |flights = 1 |max-altitude = 20846 feet AGL (TeleMega, GPS) (6354 m) |max-speed = 1766 ft/sec (1204 mph, Mach 1.6) (TeleMega, accelerometer) |status = Ready to fly |simfile = https://github.com/DanCrank/openrocket-sim-files/blob/master/kestrel.ork }} Kes..."
- 20:0420:04, 28 November 2021 diff hist +55 N File:Kestrel-build-04-finished.jpg Finished rocket, with motor alongside it. current
- 20:0320:03, 28 November 2021 diff hist +42 N File:Kestrel-build-03-antenna.jpg Kestrel's antenna protector. current
- 20:0320:03, 28 November 2021 diff hist +43 N File:Kestrel-build-02-sled.jpg Kestrel's sled with TeleMega. current
- 20:0220:02, 28 November 2021 diff hist +42 N File:Kestrel-build-01-finjig.jpg Bonding of fins to airframe. current
- 13:5513:55, 28 November 2021 diff hist +21 Matching Moment of Inertia in OpenRocket No edit summary current
- 13:5413:54, 28 November 2021 diff hist −46 Main Page No edit summary
- 13:5413:54, 28 November 2021 diff hist +2 2021 Launch Reports No edit summary
- 13:5313:53, 28 November 2021 diff hist +677 N 2021 Launch Reports Created page with "__FORCETOC__ 2020 and most of 2021 were a launch hiatus for me, due to the COVID-19 pandemic. Airfest and Midwest Power were not cancelled, but I didn't feel comfortable traveling, so I skipped them. In the fall of 2021, we seemed to get a respite between the delta and omicron variants where it looked like things ''might'' be getting back to normal, so I went to a couple of local launches with projects I'd been working on while housebound. ==SLRA Halloween Spooktacular..."
- 13:4513:45, 28 November 2021 diff hist +6 2016 Launch Reports No edit summary Tag: Manual revert
- 13:4513:45, 28 November 2021 diff hist +6 2015 Launch Reports No edit summary current
- 13:4413:44, 28 November 2021 diff hist +6 2014 Launch Reports No edit summary current
- 13:4413:44, 28 November 2021 diff hist +6 2013 Launch Reports No edit summary current
- 13:4313:43, 28 November 2021 diff hist −6 2016 Launch Reports No edit summary Tag: Reverted
- 13:4213:42, 28 November 2021 diff hist +23 2015 Launch Reports No edit summary
- 13:4213:42, 28 November 2021 diff hist +23 2014 Launch Reports No edit summary
- 13:4213:42, 28 November 2021 diff hist +23 2013 Launch Reports No edit summary
- 13:3413:34, 28 November 2021 diff hist +167 Buster No edit summary
- 13:2713:27, 28 November 2021 diff hist +289 Buster No edit summary
- 13:2313:23, 28 November 2021 diff hist +3 Buster No edit summary
- 13:2313:23, 28 November 2021 diff hist +274 Buster No edit summary
- 13:1913:19, 28 November 2021 diff hist +39 Buster No edit summary
- 13:1713:17, 28 November 2021 diff hist +26 Main Page No edit summary
- 13:1513:15, 28 November 2021 diff hist +5,290 Buster No edit summary
- 12:5312:53, 28 November 2021 diff hist +29 N File:Buster-build-27-finished.jpg Finished rocket current
- 12:5212:52, 28 November 2021 diff hist +137 N File:Buster-build-26-sticker.jpg "Buster" graphics applied to upper airframe. Vinyl designed by me based on the Mythbusters logo and cut on my vinyl cutter. current
- 12:5012:50, 28 November 2021 diff hist +86 N File:Buster-build-25-charge-cans.jpg Av-bay forward bulkhead showing eyebolt added to secure charge canisters current
- 12:4812:48, 28 November 2021 diff hist +38 N File:Buster-build-24-terminal-blocks.jpg Bulkhead terminal blocks current
- 12:4712:47, 28 November 2021 diff hist +147 N File:Buster-build-23-av-bay.jpg Electronics sled with batteries, switches and altimeters (RRC3 and RRC2+). Batteries to be secured to sled with zip ties (not shown). current
- 12:4512:45, 28 November 2021 diff hist +50 N File:Buster-build-22-finished-weight.jpg No-motor weight: 27 pounds 8 ounces. current
- 12:4212:42, 28 November 2021 diff hist +101 N File:Buster-build-21-finished-paint.jpg Weighing and balancing the rocket with all paint finished and the first few stickers on current
- 12:4112:41, 28 November 2021 diff hist +48 N File:Buster-build-20-lower-airframe-painted.jpg Lower airframe with finished paint current
- 12:4012:40, 28 November 2021 diff hist +74 N File:Buster-build-19-lower-airframe-masked.jpg Lower airframe masked for application of white paint on fins current
- 12:3912:39, 28 November 2021 diff hist +44 N File:Buster-build-18-lower-airframe-orange.jpg Lower airframe in orange paint current
- 12:3812:38, 28 November 2021 diff hist +47 N File:Buster-build-17-lower-airframe-primer.jpg Lower airframe in sandable primer current
- 12:3612:36, 28 November 2021 diff hist +63 N File:Buster-build-16-lower-airframe-paint-prep.jpg Lower airframe completed and prepped for painting current
- 12:3312:33, 28 November 2021 diff hist +62 N File:Buster-build-15-external-fillets.jpg Application of external fin fillets (RocketPoxy) current
- 12:3212:32, 28 November 2021 diff hist +77 N File:Buster-build-14-internal-fillets.jpg Injection of internal fillets with Loc-Tite 2-hour marine epoxy current
- 12:3012:30, 28 November 2021 diff hist +86 N File:Buster-build-13-fin-bonding.jpg Alignment and bonding of additional fins using plywood strips and clamps current
- 12:2812:28, 28 November 2021 diff hist +34 N File:Buster-build-12-fin-bonding.jpg Bonding of third fin current
- 12:2712:27, 28 November 2021 diff hist +60 N File:Buster-build-11-fin-bonding.jpg Bonding of first fin, using foam-board fin jig current
- 12:2412:24, 28 November 2021 diff hist 0 File:Buster-build-08-forward-cr-fillet.jpg Danno uploaded a new version of File:Buster-build-08-forward-cr-fillet.jpg current
- 12:1412:14, 28 November 2021 diff hist +96 N File:Buster-build-10-aft-assembled.jpg Completed aft assembly of lower airframe, tailcone, motor mount and motor retainer current
- 12:1212:12, 28 November 2021 diff hist +76 N File:Buster-build-09-tailcone-cr-fillet.jpg Injected fillet between motor mount, tailcone, and tailcone CR current
- 12:1112:11, 28 November 2021 diff hist +62 N File:Buster-build-08-forward-cr-fillet.jpg Fillet of forward CR to inside of lower airframe
- 12:0912:09, 28 November 2021 diff hist +60 N File:Buster-build-07-aft-cr-fillet.jpg Fillet of aft CR to inside of tailcone coupler current
- 12:0712:07, 28 November 2021 diff hist +170 N File:Buster-build-06-aft-end-dry-fit.jpg Dry fit of aft end, showing precise alignment of fin slots and correct clearance for motor retainer after bonding of the motor mount into the lower airframe current
- 12:0112:01, 28 November 2021 diff hist +107 N File:Buster-build-05-centering-rings.jpg Bonding of centering rings, and laminating epoxy painted over the top of the bonded y-harness current
- 11:5911:59, 28 November 2021 diff hist +57 N File:Buster-build-04-bonding-y-harness.jpg Bonding of the y-harness to the motor mount current