Jump to content

Uploads by Danno

This special page shows all uploaded files.

File list
First pagePrevious pageNext pageLast page
Date Name Thumbnail Size Description Versions
11:18, 30 April 2023 Gemini-one-motor-3.jpg (file) 43 KB   1
11:17, 30 April 2023 Gemini-one-motor.jpg (file) 41 KB   1
19:59, 18 April 2023 Gemini-titan.jpg (file) 673 KB   1
19:42, 18 April 2023 Blue-phenix-jr.jpg (file) 447 KB   1
16:15, 15 April 2023 Torellian-invader-catalog.jpg (file) 142 KB   1
16:02, 15 April 2023 Torellian-invader.jpg (file) 395 KB   1
15:49, 15 April 2023 Berthimus-reborn-collage.jpg (file) 696 KB   1
15:15, 15 April 2023 Berthimus-reborn.jpg (file) 2.2 MB   1
14:57, 15 April 2023 03-situation.jpg (file) 663 KB   1
14:54, 15 April 2023 02-treed.jpg (file) 310 KB   1
14:51, 15 April 2023 Arreaux-first-launch.jpg (file) 64 KB   1
14:49, 15 April 2023 Build01-unboxing.jpg (file) 92 KB   1
14:29, 15 April 2023 Arreaux.jpg (file) 1.55 MB   1
20:38, 5 December 2021 Swamp-gas-pcb-finished.jpg (file) 3.25 MB Manufactured controller PCB with all components soldered in. 1
20:35, 5 December 2021 Swamp-gas-fab.png (file) 147 KB Screenshot of oshpark.com website as I was putting in the fabrication order for the Swamp Gas controller PCB. 1
13:48, 5 December 2021 Gjah-on-pad.jpg (file) 265 KB "Gravity's Just a Habit" on the launch pad in Elsberry, prior to its first flight. 1
13:32, 5 December 2021 Swamp-gas.jpg (file) 2.18 MB Photo of completed "Swamp Gas" saucer rocket, in workshop prior to first flight. 1
20:04, 28 November 2021 Kestrel-build-04-finished.jpg (file) 3.77 MB Finished rocket, with motor alongside it. 1
20:03, 28 November 2021 Kestrel-build-03-antenna.jpg (file) 1.5 MB Kestrel's antenna protector. 1
20:03, 28 November 2021 Kestrel-build-02-sled.jpg (file) 2.06 MB Kestrel's sled with TeleMega. 1
20:02, 28 November 2021 Kestrel-build-01-finjig.jpg (file) 103 KB Bonding of fins to airframe. 1
12:53, 28 November 2021 Buster-build-27-finished.jpg (file) 3.88 MB Finished rocket 1
12:52, 28 November 2021 Buster-build-26-sticker.jpg (file) 2.96 MB "Buster" graphics applied to upper airframe. Vinyl designed by me based on the Mythbusters logo and cut on my vinyl cutter. 1
12:50, 28 November 2021 Buster-build-25-charge-cans.jpg (file) 2.83 MB Av-bay forward bulkhead showing eyebolt added to secure charge canisters 1
12:48, 28 November 2021 Buster-build-24-terminal-blocks.jpg (file) 2.29 MB Bulkhead terminal blocks 1
12:47, 28 November 2021 Buster-build-23-av-bay.jpg (file) 1.97 MB Electronics sled with batteries, switches and altimeters (RRC3 and RRC2+). Batteries to be secured to sled with zip ties (not shown). 1
12:45, 28 November 2021 Buster-build-22-finished-weight.jpg (file) 2.37 MB No-motor weight: 27 pounds 8 ounces. 1
12:42, 28 November 2021 Buster-build-21-finished-paint.jpg (file) 1.77 MB Weighing and balancing the rocket with all paint finished and the first few stickers on 1
12:41, 28 November 2021 Buster-build-20-lower-airframe-painted.jpg (file) 1.39 MB Lower airframe with finished paint 1
12:40, 28 November 2021 Buster-build-19-lower-airframe-masked.jpg (file) 1.48 MB Lower airframe masked for application of white paint on fins 1
12:39, 28 November 2021 Buster-build-18-lower-airframe-orange.jpg (file) 1.25 MB Lower airframe in orange paint 1
12:38, 28 November 2021 Buster-build-17-lower-airframe-primer.jpg (file) 916 KB Lower airframe in sandable primer 1
12:36, 28 November 2021 Buster-build-16-lower-airframe-paint-prep.jpg (file) 1.28 MB Lower airframe completed and prepped for painting 1
12:33, 28 November 2021 Buster-build-15-external-fillets.jpg (file) 424 KB Application of external fin fillets (RocketPoxy) 1
12:32, 28 November 2021 Buster-build-14-internal-fillets.jpg (file) 625 KB Injection of internal fillets with Loc-Tite 2-hour marine epoxy 1
12:30, 28 November 2021 Buster-build-13-fin-bonding.jpg (file) 397 KB Alignment and bonding of additional fins using plywood strips and clamps 1
12:28, 28 November 2021 Buster-build-12-fin-bonding.jpg (file) 444 KB Bonding of third fin 1
12:27, 28 November 2021 Buster-build-11-fin-bonding.jpg (file) 1.38 MB Bonding of first fin, using foam-board fin jig 1
12:24, 28 November 2021 Buster-build-08-forward-cr-fillet.jpg (file) 244 KB   2
12:14, 28 November 2021 Buster-build-10-aft-assembled.jpg (file) 672 KB Completed aft assembly of lower airframe, tailcone, motor mount and motor retainer 1
12:12, 28 November 2021 Buster-build-09-tailcone-cr-fillet.jpg (file) 507 KB Injected fillet between motor mount, tailcone, and tailcone CR 1
12:09, 28 November 2021 Buster-build-07-aft-cr-fillet.jpg (file) 1,015 KB Fillet of aft CR to inside of tailcone coupler 1
12:07, 28 November 2021 Buster-build-06-aft-end-dry-fit.jpg (file) 1.59 MB Dry fit of aft end, showing precise alignment of fin slots and correct clearance for motor retainer after bonding of the motor mount into the lower airframe 1
12:01, 28 November 2021 Buster-build-05-centering-rings.jpg (file) 1.46 MB Bonding of centering rings, and laminating epoxy painted over the top of the bonded y-harness 1
11:59, 28 November 2021 Buster-build-04-bonding-y-harness.jpg (file) 1.29 MB Bonding of the y-harness to the motor mount 1
11:58, 28 November 2021 Buster-build-03-tailcone-coupler.jpg (file) 412 KB Coupler for tailcone (pre-bonding), showing cutout to fit around t-nut 1
11:56, 28 November 2021 Buster-build-02-aft-centering-ring.jpg (file) 658 KB Aft centering ring (pre-bonding), showing cutout to fit around t-nut 1
11:53, 28 November 2021 Buster-build-01-rail-button-backing.jpg (file) 224 KB Backing t-nuts for rail buttons in lower airframe 1
10:15, 27 November 2021 Buster2.jpg (file) 1.29 MB Launch of Buster on its second flight, for Dan Crank's NAR level 3 certification. Taken on November 5, 2016 at Midwest Power. Photo by Mrs. Ranum (Sather Ranum's wife - I don't know her first name). 1
17:59, 19 June 2021 Moment-of-inertia.jpg (file) 138 KB   1
First pagePrevious pageNext pageLast page