Main public logs
Appearance
Combined display of all available logs of Danno's Rocket Wiki. You can narrow down the view by selecting a log type, the username (case-sensitive), or the affected page (also case-sensitive).
- 20:03, 28 November 2021 Danno talk contribs uploaded File:Kestrel-build-02-sled.jpg (Kestrel's sled with TeleMega.)
- 20:02, 28 November 2021 Danno talk contribs created page File:Kestrel-build-01-finjig.jpg (Bonding of fins to airframe.)
- 20:02, 28 November 2021 Danno talk contribs uploaded File:Kestrel-build-01-finjig.jpg (Bonding of fins to airframe.)
- 13:53, 28 November 2021 Danno talk contribs created page 2021 Launch Reports (Created page with "__FORCETOC__ 2020 and most of 2021 were a launch hiatus for me, due to the COVID-19 pandemic. Airfest and Midwest Power were not cancelled, but I didn't feel comfortable traveling, so I skipped them. In the fall of 2021, we seemed to get a respite between the delta and omicron variants where it looked like things ''might'' be getting back to normal, so I went to a couple of local launches with projects I'd been working on while housebound. ==SLRA Halloween Spooktacular...")
- 12:53, 28 November 2021 Danno talk contribs created page File:Buster-build-27-finished.jpg (Finished rocket)
- 12:53, 28 November 2021 Danno talk contribs uploaded File:Buster-build-27-finished.jpg (Finished rocket)
- 12:52, 28 November 2021 Danno talk contribs created page File:Buster-build-26-sticker.jpg ("Buster" graphics applied to upper airframe. Vinyl designed by me based on the Mythbusters logo and cut on my vinyl cutter.)
- 12:52, 28 November 2021 Danno talk contribs uploaded File:Buster-build-26-sticker.jpg ("Buster" graphics applied to upper airframe. Vinyl designed by me based on the Mythbusters logo and cut on my vinyl cutter.)
- 12:50, 28 November 2021 Danno talk contribs created page File:Buster-build-25-charge-cans.jpg (Av-bay forward bulkhead showing eyebolt added to secure charge canisters)
- 12:50, 28 November 2021 Danno talk contribs uploaded File:Buster-build-25-charge-cans.jpg (Av-bay forward bulkhead showing eyebolt added to secure charge canisters)
- 12:48, 28 November 2021 Danno talk contribs created page File:Buster-build-24-terminal-blocks.jpg (Bulkhead terminal blocks)
- 12:48, 28 November 2021 Danno talk contribs uploaded File:Buster-build-24-terminal-blocks.jpg (Bulkhead terminal blocks)
- 12:47, 28 November 2021 Danno talk contribs created page File:Buster-build-23-av-bay.jpg (Electronics sled with batteries, switches and altimeters (RRC3 and RRC2+). Batteries to be secured to sled with zip ties (not shown).)
- 12:47, 28 November 2021 Danno talk contribs uploaded File:Buster-build-23-av-bay.jpg (Electronics sled with batteries, switches and altimeters (RRC3 and RRC2+). Batteries to be secured to sled with zip ties (not shown).)
- 12:45, 28 November 2021 Danno talk contribs created page File:Buster-build-22-finished-weight.jpg (No-motor weight: 27 pounds 8 ounces.)
- 12:45, 28 November 2021 Danno talk contribs uploaded File:Buster-build-22-finished-weight.jpg (No-motor weight: 27 pounds 8 ounces.)
- 12:42, 28 November 2021 Danno talk contribs created page File:Buster-build-21-finished-paint.jpg (Weighing and balancing the rocket with all paint finished and the first few stickers on)
- 12:42, 28 November 2021 Danno talk contribs uploaded File:Buster-build-21-finished-paint.jpg (Weighing and balancing the rocket with all paint finished and the first few stickers on)
- 12:41, 28 November 2021 Danno talk contribs created page File:Buster-build-20-lower-airframe-painted.jpg (Lower airframe with finished paint)
- 12:41, 28 November 2021 Danno talk contribs uploaded File:Buster-build-20-lower-airframe-painted.jpg (Lower airframe with finished paint)
- 12:40, 28 November 2021 Danno talk contribs created page File:Buster-build-19-lower-airframe-masked.jpg (Lower airframe masked for application of white paint on fins)
- 12:40, 28 November 2021 Danno talk contribs uploaded File:Buster-build-19-lower-airframe-masked.jpg (Lower airframe masked for application of white paint on fins)
- 12:39, 28 November 2021 Danno talk contribs created page File:Buster-build-18-lower-airframe-orange.jpg (Lower airframe in orange paint)
- 12:39, 28 November 2021 Danno talk contribs uploaded File:Buster-build-18-lower-airframe-orange.jpg (Lower airframe in orange paint)
- 12:38, 28 November 2021 Danno talk contribs created page File:Buster-build-17-lower-airframe-primer.jpg (Lower airframe in sandable primer)
- 12:38, 28 November 2021 Danno talk contribs uploaded File:Buster-build-17-lower-airframe-primer.jpg (Lower airframe in sandable primer)
- 12:36, 28 November 2021 Danno talk contribs created page File:Buster-build-16-lower-airframe-paint-prep.jpg (Lower airframe completed and prepped for painting)
- 12:36, 28 November 2021 Danno talk contribs uploaded File:Buster-build-16-lower-airframe-paint-prep.jpg (Lower airframe completed and prepped for painting)
- 12:33, 28 November 2021 Danno talk contribs created page File:Buster-build-15-external-fillets.jpg (Application of external fin fillets (RocketPoxy))
- 12:33, 28 November 2021 Danno talk contribs uploaded File:Buster-build-15-external-fillets.jpg (Application of external fin fillets (RocketPoxy))
- 12:32, 28 November 2021 Danno talk contribs created page File:Buster-build-14-internal-fillets.jpg (Injection of internal fillets with Loc-Tite 2-hour marine epoxy)
- 12:32, 28 November 2021 Danno talk contribs uploaded File:Buster-build-14-internal-fillets.jpg (Injection of internal fillets with Loc-Tite 2-hour marine epoxy)
- 12:30, 28 November 2021 Danno talk contribs created page File:Buster-build-13-fin-bonding.jpg (Alignment and bonding of additional fins using plywood strips and clamps)
- 12:30, 28 November 2021 Danno talk contribs uploaded File:Buster-build-13-fin-bonding.jpg (Alignment and bonding of additional fins using plywood strips and clamps)
- 12:28, 28 November 2021 Danno talk contribs created page File:Buster-build-12-fin-bonding.jpg (Bonding of third fin)
- 12:28, 28 November 2021 Danno talk contribs uploaded File:Buster-build-12-fin-bonding.jpg (Bonding of third fin)
- 12:27, 28 November 2021 Danno talk contribs created page File:Buster-build-11-fin-bonding.jpg (Bonding of first fin, using foam-board fin jig)
- 12:27, 28 November 2021 Danno talk contribs uploaded File:Buster-build-11-fin-bonding.jpg (Bonding of first fin, using foam-board fin jig)
- 12:24, 28 November 2021 Danno talk contribs uploaded a new version of File:Buster-build-08-forward-cr-fillet.jpg
- 12:14, 28 November 2021 Danno talk contribs created page File:Buster-build-10-aft-assembled.jpg (Completed aft assembly of lower airframe, tailcone, motor mount and motor retainer)
- 12:14, 28 November 2021 Danno talk contribs uploaded File:Buster-build-10-aft-assembled.jpg (Completed aft assembly of lower airframe, tailcone, motor mount and motor retainer)
- 12:12, 28 November 2021 Danno talk contribs created page File:Buster-build-09-tailcone-cr-fillet.jpg (Injected fillet between motor mount, tailcone, and tailcone CR)
- 12:12, 28 November 2021 Danno talk contribs uploaded File:Buster-build-09-tailcone-cr-fillet.jpg (Injected fillet between motor mount, tailcone, and tailcone CR)
- 12:11, 28 November 2021 Danno talk contribs created page File:Buster-build-08-forward-cr-fillet.jpg (Fillet of forward CR to inside of lower airframe)
- 12:11, 28 November 2021 Danno talk contribs uploaded File:Buster-build-08-forward-cr-fillet.jpg (Fillet of forward CR to inside of lower airframe)
- 12:09, 28 November 2021 Danno talk contribs created page File:Buster-build-07-aft-cr-fillet.jpg (Fillet of aft CR to inside of tailcone coupler)
- 12:09, 28 November 2021 Danno talk contribs uploaded File:Buster-build-07-aft-cr-fillet.jpg (Fillet of aft CR to inside of tailcone coupler)
- 12:07, 28 November 2021 Danno talk contribs created page File:Buster-build-06-aft-end-dry-fit.jpg (Dry fit of aft end, showing precise alignment of fin slots and correct clearance for motor retainer after bonding of the motor mount into the lower airframe)
- 12:07, 28 November 2021 Danno talk contribs uploaded File:Buster-build-06-aft-end-dry-fit.jpg (Dry fit of aft end, showing precise alignment of fin slots and correct clearance for motor retainer after bonding of the motor mount into the lower airframe)
- 12:06, 28 November 2021 Danno talk contribs deleted page File:Buster-build-06-aft-end-assembled.jpg