Buster: Difference between revisions

From Danno's Rocket Wiki
No edit summary
No edit summary
 
(5 intermediate revisions by the same user not shown)
Line 15: Line 15:


The kit is a Rocketry Warehouse Terminator 5 with an extended forward airframe section using a 36“ long tube in place of the 22” tube supplied with the kit, to allow for larger parachutes. It uses a Spherachutes 24“ heavy-duty drogue and a Fruity Chutes 84” toroidal main parachute deployed from a bag with Fruity Chutes 48“ toroidal pilot parachute. The nose cone detaches at main deployment and descend on the pilot parachute separately from the rest of the rocket. Deployment is handled by a MissileWorks RRC3, with an RRC2+ as an independent backup system. A TeleMetrum TeleGPS tracker is carried in the nose and a BigRedBee BeeLine tracker in the av-bay. Finally, a Mobius video camera is carried in an external shroud attached to the upper airframe, pointing downwards.
The kit is a Rocketry Warehouse Terminator 5 with an extended forward airframe section using a 36“ long tube in place of the 22” tube supplied with the kit, to allow for larger parachutes. It uses a Spherachutes 24“ heavy-duty drogue and a Fruity Chutes 84” toroidal main parachute deployed from a bag with Fruity Chutes 48“ toroidal pilot parachute. The nose cone detaches at main deployment and descend on the pilot parachute separately from the rest of the rocket. Deployment is handled by a MissileWorks RRC3, with an RRC2+ as an independent backup system. A TeleMetrum TeleGPS tracker is carried in the nose and a BigRedBee BeeLine tracker in the av-bay. Finally, a Mobius video camera is carried in an external shroud attached to the upper airframe, pointing downwards.
My [https://danno.org/RocketBlogFiles/L3CertPackage-DanCrank.pdf Level 3 certification package] is available; it contains more detailed design and build information.


== Build ==
== Build ==
Line 22: Line 24:
The rocket was finished with Rustoleum sandable primer and Rustoleum gloss enamel. All of the graphics were made on my vinyl cutter, except for the "crash test dummy" stickers, which I bought on RedBubble.
The rocket was finished with Rustoleum sandable primer and Rustoleum gloss enamel. All of the graphics were made on my vinyl cutter, except for the "crash test dummy" stickers, which I bought on RedBubble.


<center>
<gallery mode="slideshow">
<gallery mode="slideshow">
File:Buster-build-01-rail-button-backing.jpg|Backing t-nuts for rail buttons in lower airframe.|alt=Backing t-nuts for rail buttons in lower airframe.
File:Buster-build-01-rail-button-backing.jpg|Backing t-nuts for rail buttons in lower airframe.|alt=Backing t-nuts for rail buttons in lower airframe.
Line 51: Line 54:
File:Buster-build-27-finished.jpg|Finished rocket.|alt=Finished rocket.
File:Buster-build-27-finished.jpg|Finished rocket.|alt=Finished rocket.
</gallery>
</gallery>
{{#evu:https://www.youtube.com/watch?v=rowRF30y2X8
|alignment=inline
}}
{{#evu:https://www.youtube.com/watch?v=HSnwf1bcCxU
|alignment=inline
}}
{{#evu:https://www.youtube.com/watch?v=ESkoIR90kyM
|alignment=inline
}}
{{#evu:https://www.youtube.com/watch?v=GNd03UbvHrM
|alignment=inline
}}
</center>


== Launches ==
== Launches ==
[[2016 Launch Reports#Buster, L1355|Test flight at Airfest 2016, CTI L1355]]
[[2016 Launch Reports#Buster, M1401|Level 3 certification flight at Midwest Power 2016, M1401]]
[[2017 Launch Reports#Buster, M1850|Airfest 2017, M1850]]
[[2017 Launch Reports#Buster, M1500|SLRA launch (Addieville), fall 2017, M1500]]


[[Category:Rockets]]
[[Category:Rockets]]

Latest revision as of 19:37, 8 May 2023

Buster is the rocket I built for my NAR level 3 certification, which I achieved in November 2016. I spent about six months on the build (March through August 2016) and flew it for the first time at Airfest that year, on an L1355 motor. My certification attempt was Buster's second flight, on an M1401. Since then, I have flown Buster twice more: at Airfest 2017 on an M1850, and at a local SLRA launch on an M1500.

The kit is a Rocketry Warehouse Terminator 5 with an extended forward airframe section using a 36“ long tube in place of the 22” tube supplied with the kit, to allow for larger parachutes. It uses a Spherachutes 24“ heavy-duty drogue and a Fruity Chutes 84” toroidal main parachute deployed from a bag with Fruity Chutes 48“ toroidal pilot parachute. The nose cone detaches at main deployment and descend on the pilot parachute separately from the rest of the rocket. Deployment is handled by a MissileWorks RRC3, with an RRC2+ as an independent backup system. A TeleMetrum TeleGPS tracker is carried in the nose and a BigRedBee BeeLine tracker in the av-bay. Finally, a Mobius video camera is carried in an external shroud attached to the upper airframe, pointing downwards.

My Level 3 certification package is available; it contains more detailed design and build information.

Build

RocketPoxy was used for most bonding of parts. JB-Weld was used to bond the motor retainer and y-harness to the motor mount. US Composites laminating epoxy was used over the top of the y-harness where it was bonded to the motor mount. Loc-Tite 2-hour marine epoxy was used for injecting internal fin fillets and to inject a fillet for the tailcone's centering ring.

The rocket was finished with Rustoleum sandable primer and Rustoleum gloss enamel. All of the graphics were made on my vinyl cutter, except for the "crash test dummy" stickers, which I bought on RedBubble.

Launches

Test flight at Airfest 2016, CTI L1355

Level 3 certification flight at Midwest Power 2016, M1401

Airfest 2017, M1850

SLRA launch (Addieville), fall 2017, M1500